Before scheduling
Record product model and configuration, delivery scope, installation owner and the applicable manual. Confirm site information using the manufacturer’s requirements: available space, access route and any specified utilities. Document who checks each requirement rather than copying assumptions from another equipment type.
At receipt
Record the delivered packages and visible damage with the order reference. Compare the inventory to the product’s actual packing list. Separate missing packages from missing parts. Keep unresolved discrepancies open until the responsible delivery or support team confirms the next step.
Before assembly
Capture model and serial label photos and confirm that the instructions match. Provide the approved tool list, parts inventory and installer scope. If the product differs from the manual, pause the affected task and obtain the correct documentation rather than adapting another machine’s sequence.
At completion
Document which manufacturer-prescribed checks were completed, by whom and on which date. Record exceptions and their owner. Avoid an unchecked “all safe” field: completion should refer to the actual required checks. Capture images only where they provide useful evidence and do not reveal unnecessary personal information.