Insert wooden dowels into base railsView in 3D
Insert wooden dowels (H4) into the ends of the short base frame rails (J).
Hudson Crib — Hudson Crib Assembly Guide
Tap any step below to jump straight to it in the 3D viewer. The AI copilot inside answers questions by voice or chat.
All tools and parts for the full guide, with quantities when available.
Click a step to open it in 3D. Click any diagram to enlarge.
Insert wooden dowels (H4) into the ends of the short base frame rails (J).
Connect the long base frame rails (I) to the short base frame rails (J) using bolts (H11) and lock washers (H6).
Insert wooden dowels (H4) into the top edges of the assembled base frame.
Insert wooden dowels (H4) into the top of the feet (G).
Attach the feet (G) to the underside of the base frame (I) using bolts (H2) and lock washers (H6).
Attach the left side panel (A-1) and right side panel (B-1) to the base frame (J) using bolts (H2) and lock washers (H6).
Attach the front/back panel (C) to the base frame (I) using bolts (H2) and lock washers (H6).
Secure the side panels (A-1, B-1) to the front/back panel (C) using bolts (H1), lock washers (H6), and washers (H12).
Install the mattress support (D-1) inside the crib using bolts (H3).
Attach the second front/back panel (C) to the base frame (I) using bolts (H2) and lock washers (H6).
Secure the side panels (A-1, B-1) to the second front/back panel (C) using bolts (H1), lock washers (H6), and washers (H12).
Answers as real text for search engines and AI assistants.
Most people finish in 44–59 min. Go step by step and keep tools nearby before starting.
You need Pentalobe, Spudger, Tweezers, Heat gun.
Loosen the previous fasteners, align the part again, and only tighten fully after the connected pieces are seated correctly.
Official and community guides for this brand.
Structured from available product documentation and 3D guide data.